EV charging without broadband: 4G and Wi-Fi on every charger

Every Brim charger has 4G and Wi-Fi built in, so it is online the day it is powered. Our design pack tells you, plot by plot, which link each charger will use.

Two post-mounted Brim chargers on a development street, with houses behind

A plot has no broadband on the day the keys are handed over. The resident orders the line after moving in; the charger went on the wall before that. A remote post-mounted charger never gets a line at all.

That is why every Brim charger has 4G and Wi-Fi built in, and why our design pack tells you, plot by plot, which one each charger will use.

Why a new-build plot is offline on completion day

Coverage is not a connection. A line in the street is not a line live in the house, and on a new plot broadband is ordered after completion while the charger is commissioned before it.

89%
of UK homes (27.1 million) can get gigabit-capable broadband
Ofcom, May 2026
82%
of the UK's 30.5 million premises can get full fibre
Ofcom, May 2026
47%
of premises with full-fibre access have taken it up
Ofcom, May 2026
96%
of UK landmass has 4G coverage from at least one operator
Ofcom, May 2026

4G and Wi-Fi on every charger

The Brim charger carries 4G, Wi-Fi and Ethernet as standard. It arrives pre-commissioned, the installer mounts it and connects the power, and it reports in over 4G as soon as it is live.

When the resident's broadband arrives, the charger pairs to the home Wi-Fi from the MyBrim app. Nothing is retrofitted, nothing is ordered per plot, and no plot waits on a line.

A Brim charger on the wall beside the front door of a newly finished plot
A Brim charger on the wall beside the front door of a newly finished plot

Parking on a development does not always come with a router. When we design your site, the pack marks each plot with the link its charger will use, so you know before anything is ordered.

  • Private driveway

    Runs on 4G from commissioning and moves to the home Wi-Fi once broadband is in. Nothing for the site team to do.
  • Remote post-mounted parking

    Power and nothing else. No router is coming, so the pack marks it 4G, and it has that link from day one.
  • Communal car park

    Not on any resident's Wi-Fi. The pack marks it 4G, or Ethernet where a wired link exists, with every session metered to the driver.

The communal car park is where the link matters most: on one shared supply, load management needs to know which cars are drawing, billing needs each session’s meter reading, and driver groups need to add or remove a resident without a visit.

The Brim portal dashboard showing site activity and energy across chargers
The Brim portal dashboard showing site activity and energy across chargers

What the regulations require offline and online

The Smart Charge Points Regulations 2021 treat charging and smart charging separately. Regulation 7 says a charger that loses its network must still be able to charge a car. Regulation 5 defines smart functionality as starting with the charger being able to send and receive information over a network.

FunctionNeeds a connection
Charging a carNo
Syncing the off-peak scheduleYes
Metering and billingYes
Remote support and firmwareYes
Tariff changesYes

What works from the moment the charger is powered

The MyBrim app pairs by QR in two minutes, so the resident sets cheap hours on completion day with no router in the house. The portal gives the managing agent live activity, tariffs and billing across every site, and 24/7 UK driver support takes the first call, not the site office. The 5-year warranty follows the plot to the homeowner.

We design the site and tell you what each plot needs

Send us the site layout and our engineers return charger positions plot by plot, ducting, site load, a cost per plot, and the link each charger will run on: Wi-Fi, 4G or Ethernet. Email plugmein@fulltothebrim.com, call +44 (0)20 7097 5911, or use the contact page.

Post-mounted Brim chargers beside the drives on a new housing development
Post-mounted Brim chargers beside the drives on a new housing development

Cookie Settings

We use cookies to enhance your experience, analyse site traffic and deliver personalised content. Read our Cookie Policy.